To fill in and submit your bid, please . Learn more about how you can find new tenders with Cosuno here.

Submit your estimate

until

Bill of Quantities

Code
Description
Type
Quantity
Unit
Unit price EUR
Net total EUR
24 Remove plasterboard suspended ceiling incl. protection
24
Remove plasterboard suspended ceiling incl. protection
1.00
sqm
25 Strip & dispose false ceiling incl. auxiliary elements. Set material aside for reuse of possible.
25
Strip & dispose false ceiling incl. auxiliary elements. Set material aside for reuse of possible.
1.00
sqm
26 Remove ceiling areas for lighting/acoustic works
26
Remove ceiling areas for lighting/acoustic works
1.00
sqm
27 Remove raised access floor incl. protection Set material aside for reuse of possible.
27
Remove raised access floor incl. protection Set material aside for reuse of possible.
1.00
sqm
28 Remove localised flooring finishes
28
Remove localised flooring finishes
1.00
sqm
29 Remove existing partitions incl. fixings & disposal
29
Remove existing partitions incl. fixings & disposal
1.00
sqm
30 Remove corridor cupboard wall complete
30
Remove corridor cupboard wall complete
1.00
no.
31 Remove timber single door & frame. Set material aside for reuse of possible.
31
Remove timber single door & frame. Set material aside for reuse of possible.
1.00
no.
32 Remove glazed single door & frame Set material aside for reuse of possible.
32
Remove glazed single door & frame Set material aside for reuse of possible.
1.00
no.
33 Remove timber asymmetric door & frame
33
Remove timber asymmetric door & frame
1.00
no.
34 Remove timber double door & frame
34
Remove timber double door & frame
1.00
m
35 Strip & dispose existing skirtings
35
Strip & dispose existing skirtings
1.00
lump sum
36 Remove interior signage incl. protection .Set material aside for reuse of possible.
36
Remove interior signage incl. protection .Set material aside for reuse of possible.
1.00